Configuration Requirements
Configuration package E-Flux by Road
Contains: EVSE ID, configuration manual for the installer and registration manual for the owner of the charging station
EVBox Livo Installation & User manual
EVBox Install app
Configuration device: smartphone or tablet
Follow the steps
Step 1: Download the EVBox Install app on your smartphone or tablet.
Step 2: Open the EVBox Install app and click on Start pairing.
Step 3: Click on Scan the QR code.
Step 4: Point your device at the QR code on the configuration sticker.
Step 5: Once you’re connected to the charger, navigate to the selected charging station management platform.
Step 6: Click on Change CMP.
Step 7: Select E-Flux as the CMP.
Step 8: Press Connect and reboot the charger.
If you are the installer of the charging station, go to Step 9. If you are the owner of the charging station, go to step 10.
Step 9: Complete the following steps to activate the station on the E-Flux by Road platform:
Login to your Field Service Account or create a Field Service Account via www.e-flux.io/installer-signup*.
Go to “Setup New EVSE” in the menu on the left and enter the serial number or OCPP ID of the station.
Click on “Setup charging station”.
Click on Upload Configuration, then click Next.
Choose and define the connector type, and choose “Save Connector Configuration”.
The charging station is now activated and ready to be registered by the owner!
*A Field Service Account is for installers only and will be used as a point of contact for technical tickets.
Step 10: Complete the following steps to register the station on the E-Flux by Road platform:
Ask your installer to complete Step 9 to finish the configuration of your charger, or call E-Flux by Road to finish the configuration.
Create an E-Flux by Road account by going to www.e-flux.io/signup.
Is this charging station facilitated by your employer? Check your email for the invitation.
Follow the steps to add the location and register your charging station.
Put the sticker with the QR code on the charging station so it’s easier to identify the station if you need support.
The charging station is now registered and ready to be used!