Skip to main content
All CollectionsManuals
Manual: EO Charging
Manual: EO Charging

On this page you will find the steps to connect the EO Charging charger to the E-Flux by Road platform.

Sjoerd avatar
Written by Sjoerd
Updated over 7 months ago

Configuration Requirements

  • Configuration package E-Flux by Road.

    • Contains: Sim card (optional), EVSE ID, configuration manual for the installer and registration manual for the owner of the charging station.

  • Online installation & user guide manufacturer.

  • Configuration device: laptop/mobile phone.

Follow the steps:

Step 1: Connect your device to your charge point

Using your mobile device or laptop, search for the charge point’s hotspot. It would follow this format: EO-#######. The password to this hotspot will be the numeric portion of the hotspot name.

Step 2: Open a browser to 10.10.10.1

Now when connected to the hotspot, open a browser and enter 10.10.10.1 and hit Enter.

Step 3: Login to the page

Login to the page with these credentials. Please note that the password is the Hostname, which is visible on the login page below.

  • Login: “Installer".

  • Password: numeric portion of the Hostname.

Step 4: Edit the CSMS settings

Navigate to the CSMS tab on the left side menu. Change these parameters:

  • CSMS Server Address: “ws://ocpp.e-flux.nl/1.6/e-flux”.

  • Charger Identity: leave it on default, otherwise use the serial number of the charge point.

  • Offline Authorization is disabled.

  • Default id Tag mode is disabled.

  • Default ID Tag: 8 capital F’s - "FFFFFFFF".

  • RFID is enabled.

Click on Save.

Step 5: Connect the charge point to the Internet

Navigate to the Network tab on the left side menu. In this example, we are connecting the charge point to the Internet via WiFi. Enable WiFi using the toggle. Here, you can either manually enter your WiFi credentials or scan for an available network.

  1. Manually enter credentials

    • WiFi SSID: *your WiFi name*.

    • WiFi PSK: *your WiFi password*.

  2. Scan for an available network

    • Click on the Refresh List button, located in the upper right corner of the screen.

    • Your WiFi network should appear. Select it and click on Use as WiFi SSID.

    • Enter your WiFi password manually.

Click on Save.

Step 6: Enter the Admin tab

Navigate to the Admin tab on the left side menu. Click on Restart under the SCC client. Afterwards, restart the EVSE.

Once the charge point is rebooted, you can continue to connect it to the E-Flux by Road platform. Please, prepare the serial number of the charge point, as you will need it for the next steps.

If you are the installer of the charging station, go to step 7. If you are the owner of the charging station, go to step 8.

Step 7: Complete the following steps to activate the station on the E-Flux by Road platform:

  1. Login to your Field Service Account or create a Field Service Account via www.e-flux.io/installer-signup*.

  2. Go to “Setup New EVSE” in the menu on the left and enter the serial number or OCPP ID of the station.

  3. Click on “Setup charging station”.

  4. Click on Upload Configuration, then click Next.

  5. Choose and define the connector type, and choose “Save Connector Configuration”.

  6. The charging station is now activated and ready to be registered by the owner!

*A Field Service Account is for installers only and will be used as a point of contact for technical tickets.

Step 8: Complete the following steps to register the station on the E-Flux by Road platform:

  1. Ask your installer to complete Step 7 to finish the configuration of your charger, or call E-Flux by Road to finish the configuration.

  2. Create an E-Flux by Road account by going to www.e-flux.io/signup.

    • Is this charging station facilitated by your employer? Check your email for the invitation.

  3. Follow the steps to add the location and register your charging station.

  4. Put the sticker with the QR code on the charging station so it’s easier to identify the station if you need support.

  5. The charging station is now registered and ready to be used!

The charging station is now connected to the E-Flux by Road platform!

Did this answer your question?